Colonial Blvd NE Multi Department Project - Phases 1 & 2

Description: Joint projects with City Engineering department to reconstruct roadway, storm and water: 

  • Phase 1 water portion to replace 2,200 feet of 8” waterline originally constructed in 1917. The project limits are Market Ave to Rowland Ave. The estimated cost of the waterline is $750,000. This project is started in January 2023. 
  • Phase 2 water portion to replace 1,800 feet of 8” waterline originally constructed in 1927. The project limits are Rowland Ave to Maple Ave. This project is currently scheduled for 2025.

 

Cromer Water Reservoir

Description: Per the assessment completed in 2021, it was determined that the existing 15 million-gallon reservoir needs to be demolished and a new reservoir built in its place.  The new reservoir will be approximately 7.5 million-gallons to improve turnover and water quality in the system. The estimated cost of construction is $11 million. Funding for the project is expected to be provided through the Ohio EPA's Water Supply Revolving Loan Account. The improvements are scheduled for 2025.

 

30th Street NW and Cromer Ave NW Watermain Replacement

Description: This project includes the replacement of existing mains and installation of 2,300 feet of 8” watermain, services, and appurtenances along Cromer Ave and 30th Street NW in preparation for the Cromer Reservoir Renovations slated for 2025. The estimated cost of construction is $650K and is scheduled to begin late 2023.

 

Sugar Creek Water Treatment Plant Renovation

Description: The project includes improvements to the Sugar Creek Wellfield, Water Treatment Plant and Surge Tanks based on the recommendations outlined in the March 2020 Sugar Creek Water Treatment Capital Improvement Plan.  Major improvements are required to sustain water treatment and distribution services. Improvements include site, process, building, mechanical and electrical improvements.  The estimated cost of construction is $37 million. Partial funding provided through the Ohio EPA's Water Supply Revolving Loan Account. The renovations have started in February 2023.

 

Canton South Regionalization - Phase 2 and 3

Description: Phase 2 and Phase 3 will be completed together as a single project and will include the installation of new 2", 6", 8" and 12" water lines and appurtenances in Canton Township.  Approximately 32,700 lineal feet (6.2 miles) of water main, 57 hydrants, 97 valves and approximately 420 water service connections will be installed. The estimated cost of construction is $4.8 million.  Funding will be provided per the American Rescue Plan Act (ARPA.)  The project will be completed Spring 2023.

 

Harvard Ave Area Watermain Replacement

Description: This project includes the replacement of existing mains and the installation of 7,100 feet of 6" and 8" water main, services, and appurtenances in the Harvard Ave area where the existing water mains have reached their life expectancy and several breaks in the area have resulted in emergency repairs.  The estimated cost of construction is $1.5 million.  Partial funding will be provided per Ohio Public Works Commission (OPWC.)  The project is scheduled to begin February 2023.

 

Market Ave N Watermain Replacement

Description: This project included the replacement of existing mains and installation of 6,500 feet of 6", 8", 12", 16", 20" and 24" water main, services and appurtenances along Market Ave N from 30th St. to 44th St. ahead of the ODOT repaving project slated for 2024/2025 (PID 101269.) The estimated cost of construction is $2.1 million. Partial funding will be provided by the Ohio Public Works Commission (OPWC.)  The project is scheduled to begin May 15, 2023.

 

11th Street Multi Department Project

Description: Joint roadway, sanitary and water project.  The water portion of the project involves the replacement of existing mains and installation of 3,500 feet of 8" and 12" water main that are 100+ years old.  The approximate limits are Cleveland Ave SW to Madison Ave SW. The estimated water portion is $850 thousand.  The project is planned to start summer of 2023.

 

14th Street/Allen Ave Multi Department Project

Description: Joint sanitary and water project.  The water portion of this project involves the replacement of existing mains and installation of 1,900 feet of 4", 6" and 8" water main that are 100+ years old.  The approximate limits are Allen Ave SE to Cherry Ave SE.  The estimated water portion is $500 thousand.  The project started in January 2023.

 

34th Street NW Area Watermain Replacement

Description: This project includes the replacement of existing mains and installation of 8,400 feet of 6” and 8” water main, services, and appurtenances in the 34th Street NW area where the existing water mains have reached their life expectancy and several breaks in the area have resulted in emergency repairs. The estimated cost of construction is $2.5 million. Partial funding will be provided by the Ohio Public Works Commission (OPWC). The project is planned to begin Fall 2023.

 

Fairmount Ave Area Watermain Replacement – Phase 2

Description: This project includes the replacement of existing mains and installation of 10,500 feet of 6” and 8” water main, services, and appurtenances in the Fairmount Ave area where the existing water mains have reached their life expectancy and several breaks in the area have resulted in emergency repairs. The estimated cost of construction is $3.1 million. Partial funding will be provided by the Ohio Public Works Commission (OPWC). The project is planned to begin Fall 2023.

 

31st Street NE and Coventry Blvd NE Multi Department Project

Description: Joint storm and water project.  The water portion of this project involves the replacement of existing mains and installation of 1,500 feet of 6" and 8" water main that have reached their life expectancy. The approximate limits are Harmont Ave NE to Coventry Blvd NE and 31st Street NE to 30th Street NE.  The estimated water portion is $350 thousand.  The project is planned to start Fall 2023.

 